| Date | From | To | Departure | Arrival | Status | |
|---|---|---|---|---|---|---|
| Sep 29 | VTZ | BLR | 15:11 | 16:23 |
Landed
|
Track > |
| Sep 28 | VTZ | BLR | 14:55 | 16:50 |
Scheduled
|
Track > |
| Sep 27 | VTZ | BLR | 14:55 | 16:50 |
En-Route
|
Track > |
| Sep 26 | VTZ | BLR | 17:11 | 18:20 |
Delayed
|
Track > |
| Sep 13 | VTZ | BLR | 14:55 | 16:50 |
Scheduled
|
Track > |
Virgin Atlantic Airways Flight VS8677 connects Visakhapatnam, India to Bangalore, India, taking off from Visakhapatnam Airport VTZ and landing at Bangalore Kempegowda International Airport BLR.
How long is the VS8677 flight from Visakhapatnam to Bangalore?
The average flight time from Visakhapatnam to Bangalore is 1 hour and 10 minutes. The flight distance is 776 km / 482 miles and the average flight speed is 507 km/h / 315 mph.
What is the On-Time Performance (OTP) of Virgin Atlantic Airways Flight VS8677 Visakhapatnam to Bangalore?
The Airportia On-Time Performance Rating for Virgin Atlantic Airways Flight VS8677 is 4.7/5 stars. This metric is calculated using data from the past 10 flights.
Which terminal is the flight VS8677 arriving at?
Flight VS8677 arrives at Bangalore Kempegowda International Airport (BLR) Terminal 1.
When was the latest VS8677 flight?
The latest flight took off on Monday, September 29th, 2025 with the flight status being Landed on 16:23.
How else can the flight VS8677 be referenced as?
This Virgin Atlantic Airways flight can also be referenced as VIR8677, VS 8677, VIR 8677.
How often is flight VS8677 delayed?
On average, 20% of all VS8677 flights are delayed. The average delay is 90 minutes.
See our VS8677 Flight Tracker above for more details.
Other flights departing from Visakhapatnam VTZ: QS5309
Other flights arriving at Bangalore BLR: IX1762, QS5309, 6E6293, QP1340
All flights connecting Visakhapatnam VTZ to Bangalore BLR.
