QP1985 Flight Status Akasa Air: Mumbai to Bangalore (AKJ1985)

BOM Mumbai

Scheduled
22:50
Actual
23:07

Terminal: 2 | Gate: 44A

Departure: Wed, Nov 25, 2026 · local time UTC+5:30

Mumbai Chhatrapati Shivaji International Airport (BOM)

All BOM Departures >

BLR Bangalore

Scheduled
00:45
Landed
00:26

Terminal: 1 | Gate: A1

Arrival: Thu, Nov 26, 2026 · local time UTC+5:30

Bangalore Kempegowda International Airport (BLR)

All BLR Arrivals >

Distance: 834 km / 518 miles · Scheduled Duration: 01:55 · Typical Duration: 01:20 · Times:

QP 1985 Flight Status & Schedule Akasa Air Mumbai to Bangalore

Date From To Departure Arrival Status Details
Nov 25 BOM BLR 23:07 00:26 Landed Track >
Nov 18 BOM BLR 23:17 00:35 Landed Track >
Nov 11 BOM BLR 23:17 00:31 Landed Track >
Nov 04 BOM BLR 23:15 00:33 Landed Track >
Oct 28 BOM BLR 23:43 01:01 Landed Late Track >
Oct 21 BOM BLR 23:50 01:06 Landed Track >
Oct 14 BOM BLR 23:42 00:58 Landed Track >
Oct 07 BOM BLR 23:33 00:47 Landed Track >
Sep 30 BOM BLR 00:16 01:41 Landed Late Track >
Sep 23 BOM BLR 23:42 01:07 Landed Track >

Akasa Air operates QP 1985 from Mumbai to Bangalore, a 834 km (518 mi) trip, once a week, on Wednesdays. With 1 h 53 min in the timetable and a usual flight time of about 1 h 20 min, it often makes up time. On Wednesday it left at 23:07, 17 minutes late, and is due in Bangalore at 00:26 the next morning, 19 minutes early.

< All Mumbai BOM Departures All Bangalore BLR Arrivals >

About QP 1985

Akasa Air Flight QP1985 connects Mumbai, India to Bangalore, India, taking off from Mumbai Chhatrapati Shivaji International Airport BOM and landing at Bangalore Kempegowda International Airport BLR.

Route
Mumbai Chhatrapati Shivaji International Airport BOM to Bangalore Kempegowda International Airport BLR
Distance
834 km (518 mi)
Typical flight time
1 h 20 min
Flies
Wed
On time
7 of the last 9
Average delay when late
24 min
Usually departs from
Terminal 2

QP 1985 FAQ

How long is the QP1985 flight from Mumbai to Bangalore?
The timetable allows 1 h 53 min. Mumbai to Bangalore is 834 km (518 mi).
How often is QP1985 from Mumbai to Bangalore late?
2 of the last 9 flights arrived 15 or more minutes late; when late, by 24 minutes on average.
When was the latest QP1985 flight from Mumbai to Bangalore?
The latest QP1985 was the 22:50 (local time) departure from Mumbai on 18 November 2026; it landed 10 minutes early.
Which days does QP1985 fly from Mumbai to Bangalore?
Once a week, on Wednesdays, based on the schedule of the last 7 days.
Which terminal does QP1985 use?
It usually leaves from Terminal 2 at Mumbai Chhatrapati Shivaji International Airport (BOM) and arrives at Terminal 1 at Bangalore Kempegowda International Airport (BLR). Check the flight card above for today's terminal and gate.
What other flight numbers does QP1985 have?
Also listed as AKJ1985 (Akasa Air's ICAO code) and QP 1985.

QP1985 and Mumbai BOM to Bangalore BLR Flights

Other flights departing from Mumbai BOM: AI2986, 6E5388, EY205

Other flights arriving at Bangalore BLR: JL753, 6E593, 6E5388

All flights connecting Mumbai BOM to Bangalore BLR.