QP1985 Flight Status Akasa Air: Mumbai to Bangalore (AKJ1985)
BOM Mumbai
- Scheduled
- 22:50
- Actual
- 23:07
Terminal: 2 | Gate: 44A
Departure: Wed, Nov 25, 2026 · local time UTC+5:30
BLR Bangalore
- Scheduled
- 00:45
- Landed
- 00:26
- Delay
Terminal: 1 | Gate: A1
Arrival: Thu, Nov 26, 2026 · local time UTC+5:30
Departed 44h 08m ago · was due to land 42h 49m ago, awaiting update 100%
BOM 23:07 BLR 00:26 +1
834 km (518 mi) flown · 0 km (0 mi) to go
Estimated position based on departure and arrival times, not live tracking. Times are local at each airport.
Distance: 834 km / 518 miles · Scheduled Duration: 01:55 · Typical Duration: 01:20 · Aircraft: · Times:
QP 1985 Flight Status & Schedule Akasa Air Mumbai to Bangalore
| Date | From | To | Departure | Arrival | Status | Details |
|---|---|---|---|---|---|---|
| Nov 25 | BOM | BLR | 23:07 | 00:26 | Landed | Track > |
| Nov 18 | BOM | BLR | 23:17 | 00:35 | Landed | Track > |
| Nov 11 | BOM | BLR | 23:17 | 00:31 | Landed | Track > |
| Nov 04 | BOM | BLR | 23:15 | 00:33 | Landed | Track > |
| Oct 28 | BOM | BLR | 23:43 | 01:01 | Landed Late | Track > |
| Oct 21 | BOM | BLR | 23:50 | 01:06 | Landed | Track > |
| Oct 14 | BOM | BLR | 23:42 | 00:58 | Landed | Track > |
| Oct 07 | BOM | BLR | 23:33 | 00:47 | Landed | Track > |
| Sep 30 | BOM | BLR | 00:16 | 01:41 | Landed Late | Track > |
| Sep 23 | BOM | BLR | 23:42 | 01:07 | Landed | Track > |
Akasa Air operates QP 1985 from Mumbai to Bangalore, a 834 km (518 mi) trip, once a week, on Wednesdays. With 1 h 53 min in the timetable and a usual flight time of about 1 h 20 min, it often makes up time. On Wednesday it left at 23:07, 17 minutes late, and is due in Bangalore at 00:26 the next morning, 19 minutes early.
About QP 1985
Akasa Air Flight QP1985 connects Mumbai, India to Bangalore, India, taking off from Mumbai Chhatrapati Shivaji International Airport BOM and landing at Bangalore Kempegowda International Airport BLR.
- Route
- Mumbai Chhatrapati Shivaji International Airport BOM to Bangalore Kempegowda International Airport BLR
- Distance
- 834 km (518 mi)
- Typical flight time
- 1 h 20 min
- Flies
- Wed
- On time
- 7 of the last 9
- Average delay when late
- 24 min
- Usually departs from
- Terminal 2
QP 1985 FAQ
- How long is the QP1985 flight from Mumbai to Bangalore?
- The timetable allows 1 h 53 min. Mumbai to Bangalore is 834 km (518 mi).
- How often is QP1985 from Mumbai to Bangalore late?
- 2 of the last 9 flights arrived 15 or more minutes late; when late, by 24 minutes on average.
- When was the latest QP1985 flight from Mumbai to Bangalore?
- The latest QP1985 was the 22:50 (local time) departure from Mumbai on 18 November 2026; it landed 10 minutes early.
- Which days does QP1985 fly from Mumbai to Bangalore?
- Once a week, on Wednesdays, based on the schedule of the last 7 days.
- Which terminal does QP1985 use?
- It usually leaves from Terminal 2 at Mumbai Chhatrapati Shivaji International Airport (BOM) and arrives at Terminal 1 at Bangalore Kempegowda International Airport (BLR). Check the flight card above for today's terminal and gate.
- What other flight numbers does QP1985 have?
- Also listed as AKJ1985 (Akasa Air's ICAO code) and QP 1985.
QP1985 and Mumbai BOM to Bangalore BLR Flights
Other flights departing from Mumbai BOM: AI2986, 6E5388, EY205
Other flights arriving at Bangalore BLR: JL753, 6E593, 6E5388
All flights connecting Mumbai BOM to Bangalore BLR.
